top of page

Haydn Primary School

Commercial Flooring Refurbishment

Location: Sherwood, Nottingham

Sector: Education

Project Type: Flooring Refurbishment – Phase 2


We recently completed Phase 2 of an ongoing flooring refurbishment project at Haydn Primary School in Sherwood, Nottingham. This phase focused on delivering a durable, safe, and visually appealing flooring solution that could withstand the daily demands of a busy school environment.


The project involved a full subfloor overhaul and high-quality finish, including:


  • Removal of the existing floor covering and loose concrete

  • Application of a solid base layer of screed

  • Installation of a liquid damp-proof membrane for long-term moisture protection

  • Deep fill screed applied at approximately 30mm to level the subfloor

  • Final top coat of finishing screed to create a smooth, even surface

  • Installation of JHS carpet tiles, offering both durability and a professional look

  • Fitting of Gradus sit-on skirting for a clean, robust edge finish



To ensure the highest standards, we used trusted, industry-leading products from:

🔹 F. Ball and Co. Ltd – Screeds and subfloor preparation

🔹 JHS Carpets – High-performance carpet solutions

🔹 Gradus – Skirting and finishing systems


This phase was completed efficiently and to a high standard, ready for the next stage of improvements. We’re proud to continue supporting the education sector with flooring solutions that blend practicality, safety, and style.

Project Gallery

bottom of page