
Haydn Primary School
Commercial Flooring Refurbishment
Location: Sherwood, Nottingham
Sector: Education
Project Type: Flooring Refurbishment – Phase 2
We recently completed Phase 2 of an ongoing flooring refurbishment project at Haydn Primary School in Sherwood, Nottingham. This phase focused on delivering a durable, safe, and visually appealing flooring solution that could withstand the daily demands of a busy school environment.
The project involved a full subfloor overhaul and high-quality finish, including:
Removal of the existing floor covering and loose concrete
Application of a solid base layer of screed
Installation of a liquid damp-proof membrane for long-term moisture protection
Deep fill screed applied at approximately 30mm to level the subfloor
Final top coat of finishing screed to create a smooth, even surface
Installation of JHS carpet tiles, offering both durability and a professional look
Fitting of Gradus sit-on skirting for a clean, robust edge finish
To ensure the highest standards, we used trusted, industry-leading products from:
🔹 F. Ball and Co. Ltd – Screeds and subfloor preparation
🔹 JHS Carpets – High-performance carpet solutions
🔹 Gradus – Skirting and finishing systems
This phase was completed efficiently and to a high standard, ready for the next stage of improvements. We’re proud to continue supporting the education sector with flooring solutions that blend practicality, safety, and style.
Project Gallery












